Aircraft components, units and assembly are operated of the following ways:

  • Resource maintenance ;
  • On-condition maintenance with reliability level control.

It is stipulated by aircraft maintenance regulations to carry out operational and
periodic forms of maintenance:

  • Line maintenance check
  • Scheduled maintenance check
  • Maintenance in store
  • Maintenance after emergency cases occurred during flight or on ground

Forms of maintenance

LINE MAINTENANCE

ОС Form (Parking)
When parking period is more than 2 hours

ВС Form (Meeting)
After each landing

ОВ Form (Flight)
Before each flight

Т Form

  • Before each flight.
  • Before each flight after scheduled inspection, by training flights
  • when another fueling up is scheduled .
  • Before flight after completed maintenance according to T, E, W
  • Forms the parking period is from 12 hours to 5 days.

E Form

  • In base/terminal airport when flight hours are not less than 5 hours from
    the date of E or W Form fulfillment.
  •  After ground time more than 5 days, under condition that the
  • Aircraft was not placed in a storage
  •  Before flight after special maintenance
  •  After aircraft check flight.

W Form

  • once per 15+5 days. When at least one flight a day is
  • carried out during period of time less than 30 days
  • before flight after storage time
  • before putting aircraft into operation after delivery from
  • manufacturing plant

Periodic maintenance

А Form

Every 750  -50 flight hours

C Form

Every 36± 3 months

D Form

Every 10± 0,5 years

Maintenance in storage

In cases, when the time period between

30 days

aircraft maintenance exceeded 15 days, every

90 days

 

180 days

Maintenance after emergency cases occurred

  • Exceeding max. payload mass
  • Rough landing
  • Lightning stroke
  • After duststorm or hail
  • Failed takeoff

Maintenance manpower

No

Maintenance type

Interval Cycle / (flight hours)

Manpower (man/ hours)

Duration (hours)

Work description

Line maintenance

1

Transitional (TP)

1/2

0,44

0,33

Overall airframe, power  plant, landing gear inspection. Familiarization with integrated control system.

2

Days(D)

up to 48 hours/14 flight hours

1,11

0,5

Exterior airframe, power plant, landing gear inspection. Systems check  by integrated control system.

3

Two weeks (TW)

up to 15 days/100 flight hours

5,85

1

Exterior airframe, power plant, landing gear inspection. Systems and equipment serviceability check, monitoring and refilling of power fluids.

Periodic maintenance

4

Form А (750 hours)

90 days/ 750 flight hours

100

20

Systems and equipment serviceability check, failure diagnosis. Separate sections, detail parts of airframe, power plant, landing gear internal inspection . Oiling works.

5

Form C (7500 hours)

36 months/7500

2100

15 days

Airframe overhaul. Functional systems monitoring that require additional preparations.

6

Form D (30000 hours)

120 months/30000

6600

30 days

Airframe design diagnosis including design and systems partial removal and disassembly.

Maintainability

  • Easy access to wing attachment fitting, tail units and primary structural member for visual and instrumental monitoring.
  • Glider primary members, engine components, windmill units, landing gear and control system are adjusted for using nondestructive control technique.
  • Anticorrosion protection of all design elements, using of lasting paint-and-lacquer coating and composites make the aircraft to be operated in every weather conditions.
  • Standard instruments and ground support equipment are generally used by maintenance.

Maintenance support

Engineering support system ensures planned and operative trips of UAC’s support team to the aircraft allocation site for checking of aircraft operating condition. On the basis of information obtained according the corresponding design and maintenance engineering measures and recommendations are developed .

The central UAC’s warehouse and branches dispose enough value of spare parts, having limited life time or proved to be broken down during operation, and also quick wearing parts which could be delivered to the customer “on-call” basis.

UAC’s call center is available 24 hours / 7 days.

The orders execution is provided for:
The orders execution is provided for:

  • on urgent orders               within 4 hours  
  • on critical orders               within 24 hours
  • on general orders            within 7 days.

Spare parts support

Spare parts delivery system includes central consignment storage and regional warehouses where aircrafts are operated. By agreement with the customer it is possible to establish storages facilities at aircraft home base, whereas regular inventory and storage renewal according to spare parts consumption would be provided.

Documentation & information support

  • Notification about design modifications and improvements;
  • Service bulletin;
  • Periodic information bulletin;
  • Repair documentation and other technical and maintenance documentation modifications